Assembly and Operation of the Creden-ZzZ Cabinet Bed
Assembly
All of the Creden-ZzZ Cabinet Beds work in the same manner. Mattress, drawer and upper cabinet are packed in one carton. Open the carton, look for assembly instructions and hardware packet before disposing of packaging material. Hardware is in the drawer. Place drawer where bed will be used. Insert the 4 dowels to align the upper cabinet on the drawer base. Attach the upper cabinet to the drawer with the 6 bolts. Allen wrench is provided. Be sure to extend the levelers if the cabinet bed is used on carpet or there is an uneven floor. Download this Brochure for more information.
Operation
- Pull out the drawer from the center until it fully extends. This supports the fold-out front panel.
- Open the flip top and unlatch the slide bolts on either side and the security chain. Then open the fold-out panel onto the drawer/base.
- Open the flap, pull out the mattress.